Mission Year: 2016
Mission:
ExoMars 2016
Europe’s mission to Mars
Category:
Space Missions|Mission Heritage
Projekt:
MLI for Cassis Instrument
Multilayer Insulations; HPS equipped the whole EDM Module inside and outside with MLI and will land with 10kg MLI on Martian surface
Projekt:
Primary and tertiary structures
The ExoMars load-bearing structure of the orbiter mainly consists of CFRP & aluminum sandwich with >5300 metallic inserts, heterogeneous aluminum cores, structural and thermal doublers, grounding and painting (next to the central tube – not by INVENT). Additionally various CFRP, aluminum and titanium brackets for reaction wheels, LGA, He-tanks and star trackers were developed and manufactured.



